So in the above photo behind the kids inspecting the carpet removal there is now a space under the baseboards which was previously filled by the carpet.
Are baseboards removed to install carpet.
While you can have your baseboards removed when fitting a new carpet most contractors are going to work around it.
Do not push down on the baseboard so that it presses into the carpeting.
The carpet is attached to the tack strip stretched and cut along the tack strip.
When installing baseboard before carpet the easiest thing to do is to install it even with the bottom edge of the.
Carpet is always one of the last jobs performed on a new build because removing the baseboards for installation is not only unnecessary but can be extremely costly.
The carpet installer can run the tack strip up to the trim then roll excess carpet under the trim.
This space is bigger than the thickness of the new floors we were installing.
The idea is that you should be able to install new carpet in a future remodel without having to remove the baseboard.
Thus would look unfinished if the baseboards were not altered in some way.
Therefore you do not have to raise the baseboard if it was installed with normal space underneath for carpet installation typically a piece of scrap plywood or subfloor or baseboard is used as a gage during installation so you see 3 8 and 1 2 space commonly although i have seen as much as 1 which is too much for most carpets.
The tack strip is nailed around the perimeter of the room right along side the base board.
Baseboards do not need to be removed.
Number the walls and corresponding sections of baseboards to easily match them up later.
When installing baseboards before carpet ask the installer how large of a gap to leave between the floor and the trim e g.
Do baseboards have to be removed to install carpet.
Then the cuts are tucked between the tack strip and baseboard for a finished look with a putty knife.
If you run into a situation where it is being used to cover poorly installed carpet you need to fire the installer not assume that it s some standard lazy assed technique.
The spacer is then removed and the resulting gap is filled with base shoe.
Remove the baseboards the day before the flooring installation so you can move furniture away from the walls.
Use a utility knife to slice any caulk that secured the baseboard to the wall.
It is frequently removed from a hardwood floor when the hardwood is being carpeted over.
Personally i have never seen a shoe molding used in a carpet installation.